10/11/2026

President of Republic Kicks Off Work To Rehabilitate Boghe-Kaedi Road

President of Republic Kicks Off Work To Rehabilitate Boghe-Kaedi Road
On 30 December, His Excellency Mr. Mohamed Ould Cheikh El Ghazouani, the President of the Republic, supervised the launch of the rehabilitation work of the Boghe-Kaedi road section, 100 km long. His Excellency the President of the Republic followed, on this occasion, detailed explanations on the technical aspects relating to this project and the measures adopted so that the rehabilitation operations comply with the required standards. The overall cost of the rehabilitation of this section, whose work should be completed in 18 months, is 792,802,523 ouguiyas.

Related topics

View more

Archive

Currency rates

Base currency : MRU

CurrencyBuySell
€ Euro 44.5745.93
$ US Dollar 39.9541.16

Updated 10/11/2026 00:02